Brightline Construction Advisory – September 6, 2022

BRIGHTLINE CONSTRUCTION ADVISORY:

ORLANDO EXTENSION (ORLANDO to WEST PALM BEACH) AND

STATION CONSTRUCTION (AVENTURA and BOCA RATON)

 

Brightline announces lane closures, work zone, railroad crossing and bridge work information for the Orlando extension project from Orlando to West Palm Beach, and station construction in Aventura and Boca Raton. Motorists and watercraft should proceed with extra caution through work zones and adhere to posted detour signs, speed limits and other signage. Full closures and high-profile closures are indicated in red. Railroad construction information can also be found online at

https://www.gobrightline.com/railroad-construction and by following @GoBrightline on Twitter.

 

 

ORLANDO EXTENSION (ORLANDO to WEST PALM BEACH)

Orange County

 

Orlando International Airport

 

Northbound Jeff Fuqua Blvd. between Station Loop Rd. and Cargo Rd.

Ongoing daily single lane closure, 7 a.m. to 5 p.m., through Q4 2022.

 

Beachline Expressway/SR 528

 

Eastbound Beachline Expressway/SR 528 between Narcoossee Rd. and SR 417 (milepost 13-15)
Continuous daytime shoulder closure, 6:30 a.m. to 5 p.m.

Eastbound Beachline Expressway/SR 528 between SR 417 and Innovation Way (milepost 16-18)
Continuous daytime shoulder closure, 6:30 a.m. to 5 p.m.

Eastbound Beachline Expressway/SR 528 between Dallas Blvd. and SR 520 (milepost 27-28)
Continuous daytime shoulder closure, 7 a.m. to 7 p.m.

Westbound Beachline Expressway/SR 528 between SR 520 and Dallas Blvd. (milepost 28-27)
Continuous daytime shoulder closure, 7 a.m. to 7 p.m.

Beachline Expressway/SR 528, Goldenrod Rd. and Narcoossee Rd.

Eastbound Beachline Expressway/SR 528 between Goldenrod Rd. and SR 417 (milepost 12-15)
Continuous daytime shoulder closure, 7 a.m. to 7 p.m.

 

Eastbound Beachline Expressway/SR 528 exit ramp to Narcoossee Rd. (Exit 13)
Continuous daytime shoulder closure, 7 a.m. to 7 p.m.
Nighttime full ramp closure:

  • 10 p.m., Wednesday, September 14 to 5 a.m., Thursday, September 15 and
  • 10 p.m., Thursday, September 15 to 5 a.m., Friday, September 16.

Detour Information:

  • Eastbound Beachline Expressway/SR 528 wishing to exit onto Narcoossee Rd. (Exit 13) will be directed to exit early at Goldenrod Rd. (Exit 12), travel north on Goldenrod Rd. to Lee Vista Blvd. and travel east on Lee Vista Blvd. to access Narcoossee Rd. (SR 15).

 

Narcoossee Rd. entrance ramp to Eastbound Beachline Expressway/SR 528
Continuous daytime shoulder closure, 7 a.m. to 7 p.m.
Nighttime full ramp closure:

  • 10 p.m., Monday, September 12 to 5 a.m., Tuesday, September 13 and
  • 10 p.m., Tuesday, September 13 to 5 a.m., Wednesday, September 14.

Detour Information:

  • Narcoossee Rd. traffic wishing to continue east on the Beachline Expressway/SR 528 will be directed to access westbound Beachline Expressway/SR 528, travel west on the Beachline Expressway/SR 528 to Goldenrod Rd. (Exit 12) and travel south on Goldenrod Rd. to access eastbound Beachline Expressway/SR 528.

 

Northbound and Southbound Narcoossee Rd. at Beachline Expressway/SR 528

Daytime outside lane closure, 9 a.m. to 3 p.m., Monday September 12 to Friday, September 16.

 

Beachline Expressway/SR 528 and SR 417

 

Northbound SR 417 exit ramp to Eastbound/Westbound Beachline Expressway/SR 528 (Exit 26)

Continuous daytime shoulder closure, 7 a.m. to 7 p.m.

 

Brevard County

Beachline Expressway/SR 528

 

 

Eastbound Beachline Expressway/SR 528 (milepost 32-40)

Nighttime, single lane closure:

  • Weekdays: 7 p.m. to 9 a.m., through Friday, September 30.
  • Weekends: 8 p.m. to 9 a.m., through Friday, September 30.

 

Eastbound Beachline Expressway/SR 528 (milepost 40-42)

Single lane closures:

  • Weekdays: 9 a.m. to 5 p.m., through Friday, September 30.

Nighttime, single lane closure:

  • Weekdays: 10 p.m. to 5 a.m., through Friday, September 30.

 

Westbound Beachline Expressway/SR 528 (milepost 40 – 42)

Daytime, single lane closure:

  • Weekdays: 7 a.m. to 4 p.m., through Friday, September 30.

 

Westbound Beachline Expressway/SR 528 exit ramp to southbound I-95 (Exit 42A)

Night-time ramp closure to remove formwork and paint the I-95 bridge.

  • 10 p.m., Wednesday, September 7 to 5 a.m., Thursday, September 8.

Detour information: 

  • Westbound Beachline Expressway/SR 528 traffic wishing to access southbound I-95 will be directed to exit early at Industry Rd./SR 524/Clearlake Road (Exit 45A), travel south on Industry Road to SR 524 and travel west on SR 524 to access southbound I-95.

 


I-95

 

Northbound and Southbound I-95 at the Beachline Expressway/SR 528 Interchange (Exit 205)

  • Day-time single lane closure, 7 a.m. to 5 p.m., through Friday, September 30.
  • Night-time single lane closure, 8 p.m. to 5 a.m., through Friday, September 30.
  • Night-time double lane closure, 10 p.m. to 5 a.m., through Friday, September 30.

 

Northbound I-95 at the Beachline Expressway/SR 528 Interchange

Night-time full road closure to paint the I-95 bridge.

  • 10 p.m., Friday, September 9 to 5 a.m., Saturday, September 10,
  • 10 p.m. to 5 a.m., Monday night, September 12 to Friday morning, September 16,
  • 10 p.m., to 5 a.m., Monday night, September 19 through Friday, September 23.

Detour Information:

  • Northbound I-95 traffic will be directed to exit early at SR 524 (Exit 202), travel east on SR 524 for approximately three miles to Industry Rd., travel north on Industry Rd. to westbound SR 528 and travel west on SR 528 for approximately three miles to access northbound I-95 (Exit 42).

 

Northbound I-95 ramp to access eastbound SR-528 

Night-time full road closure to remove formwork and paint the I-95 bridge.

  • 10 p.m., Friday, September 9 to 5 a.m., Saturday, September 10,
  • 10 p.m. to 5 a.m., Monday night, September 12 to Friday morning, September 16,
  • 10 p.m., to 5 a.m., Monday night, September 19 through Friday, September 23.

Detour Information:

  • Northbound I-95 traffic will be directed to exit early at SR 524 (Exit 202), travel east on SR 524 for approximately three miles to Industry Rd. and travel north on Industry Rd. to access eastbound SR 528.

 

Southbound I-95 at the Beachline Expressway/SR 528 Interchange

Night-time full road closure to paint the I-95 bridge.

  • 10 p.m., Wednesday, September 7 to 5 a.m. Thursday, September 8.

Detour Information:

  • Southbound I-95 traffic will be directed to exit at eastbound SR 528 (Exit 205-A), travel east on SR 528 for approximately three miles to Industry Rd. (Exit 45), travel south on Industry Rd. to Clearlake Rd./SR 524 and travel east on Clearlake Rd./SR 524 for approximately three miles to access southbound I-95.

 

 

Crossings / Road Closures

 

Melbourne – Depot Dr. S. of New Haven Ave., N. of Melbourne Ave.

Daytime pile driving operations, Monday to Saturday, 7 a.m. to 7 p.m.

 

Melbourne – Railroad Crossing at Post Rd.

Full road closure, 7 a.m. Thursday, October 6 to 7 p.m. Tuesday, October 18.

Detour Information:

  • Eastbound Post Rd. traffic will be directed to travel south on Croton Rd. to Parkway Dr., travel east on Parkway Dr. to US-1 and travel north on US-1 to access Post Rd.
  • Westbound Post Rd. traffic will be directed to travel south on US-1 to Parkway Dr., travel west on Parkway Dr. to Croton Rd., and travel north on Croton Rd. to Post Rd.

 

Melbourne – Railroad Crossing at Prospect Ave. (LONGTERM CLOSURE)

Full road closure through November 2022 for bridge work at Crane Creek. Crossing will be fully closed until completion of work.

Detour Information:

  • Eastbound Prospect Ave. traffic will be directed to Stone St., travel south on Stone St. to WH Jackson St., travel east on WH Jackson St. to US-1 and travel north on US-1 to access Prospect Ave.
  • Westbound Prospect Ave. traffic will be directed to US-1, travel south on US-1 to WH Jackson St., travel west on WH Jackson St. to Stone St. and travel north on Stone St. to access Prospect Ave.

 

 

Bridges

 

Melbourne – Eau Gallie River

Daytime bridge work operations, including pile driving, Monday through Sunday, 7 a.m. to 7 p.m., continuing through 2022 to construct a railroad bridge on the east side of the new active railroad bridge.

 

Melbourne – Crane Creek

Daytime bridge work operations, including pile driving, Monday through Sunday, 7 a.m. to 7 p.m., continuing through 2022 to construct a railroad bridge on the west side of the new active railroad bridge (southwest bank).

 

Palm Bay – Turkey Creek

Daytime bridge work operations, including pile driving, Monday through Sunday, 7 a.m. to 7 p.m., continuing through Q3 2022 to construct a railroad bridge on the east side of the new active railroad bridge.

 

Brevard and Indian River Counties

 

Bridges


Sebastian – Sebastian River

Daytime bridge work operations, including pile driving and demolition work, Monday through Sunday, 7 a.m. to 7 p.m., continuing through 2022 to construct a railroad bridge on the east side of the new active railroad bridge.

 

Indian River County

 

Railroad Crossings

 

Winter Beach – Railroad Crossing at 69th St.

Full road closure, 7 a.m., Wednesday, September 21 to 7 p.m., Wednesday, October 5.

Detour Information

  • Eastbound 69th St. traffic will be directed to travel south on 51st Ave. to 65th St., travel east on 65th St. to US-1 and travel north on US-1 to 69th St.
  • Westbound 69th St. traffic will be directed to travel south on US-1 to 65th St., travel west on 65th St. to 51st Ave. and travel north on 51st Ave. to 69th St.

 

Winter Beach – Southbound Old Dixie Hwy. at 69th St.

Daily single lane closure, 7 a.m. to 7 p.m., Friday, September 30 to Wednesday, October 5.

 

Vero Beach – Railroad Crossing at 41st St.

Full road closure, 7 a.m., Monday, October 10 to 7 p.m., Tuesday, October 25.

Detour Information

  • Eastbound 41st St. traffic will be directed to travel north on 43rd Ave to 45th St., travel east on 45th St. to Old Dixie Hwy. and travel south on Old Dixie Hwy. to 41st St.
  • Westbound 41st St. traffic will be directed to travel north on Old Dixie Hwy. to 45th St., travel west on 45th St. to 43rd Ave. and travel south on 43rd Ave. to 41stSt.

 

Winter Beach – Northbound and southbound Old Dixie Hwy. at 41st St.

Daily single lane closures, 7 a.m. to 7 p.m., Wednesday, October 19 to Tuesday, October 25.

 

Vero Beach – Railroad Crossing at 21st St.

Full road closure, 7 a.m., Tuesday, November 1 to 7 p.m., Sunday, November 20.

Detour Information

  • Eastbound 21st St. traffic will be directed to travel south on 14th Ave to 19th Pl. (SR60E), travel east on 19th Pl. (SR60E) to 11th Ave. and travel north on 11thAve. to 21st St.
  • Westbound 21st St. traffic will be directed to travel east on 21st St. to 11th Ave., travel south on 11th Ave. to 20th St. (SR60W), travel west on 20th St (SR60W) to 14th Ave. and travel north on 14th Ave. to 21st St.

 

Vero Beach – Railroad Crossing at 12th St.

Full road closure, 7 a.m., Wednesday, September 7 to 7 p.m., Saturday, September 24.

Detour Information

  • Eastbound 12th St. traffic will be directed to travel north on Old Dixie Hwy. to 16th St., travel east on 16th St. to 8th Ave. and travel south on 8th Ave. to 12th St.
  • Westbound 12th St. traffic will be directed to travel north on 8th Ave. to 16th St., travel west on 16th St. to Old Dixie Hwy. and travel south on Old Dixie Hwy. to 16th St.

 

Vero Beach – Railroad Crossing at 8th St. / Glendale Rd.

Full road closure, 7 a.m., Wednesday, October 26 to 7 p.m., Wednesday, November 9.

Detour Information

  • Eastbound 8th St. traffic will be directed to travel south on Old Dixie Hwy. to 4th St., travel east on 4th St. to US-1 and travel north on US-1 to 8th St.
  • Westbound 8th St. traffic will be directed to travel south on US-1 to 4th St., travel west on 4th St. to Old Dixie Hwy. and travel north on Old Dixie Hwy. to 8th St.

 

Vero Beach – Railroad Crossing at 4th St.

Full road closure, 7 a.m., Thursday, October 6 to 7 p.m., Monday, October 24.

Detour Information

  • Eastbound 4th St. traffic will be directed to travel north on Old Dixie Hwy. to 8th St., travel east on 8th St. to US-1 and travel south on US-1 to 4th St.
  • Westbound 4th St. traffic will be directed to travel north on US-1 to 8th St., travel west on 8th St. to Old Dixie Hwy. and travel south on Old Dixie Hwy. to 4th St.

 

Vero Beach – Railroad Crossing at Oslo Rd.

Full road closure 7 a.m., Tuesday, September 13 to 7 p.m., Saturday, October 1.

Detour Information

  • Eastbound Oslo Rd. traffic will be directed to travel north on Old Dixie Hwy. to 4th St., travel east on 4th St. to US-1 and travel south on US-1 to Oslo Rd.
  • Westbound Oslo Rd Traffic will be directed to travel north on US-1 to 4th St., travel west on 4th St. to Old Dixie Hwy. and travel south on Old Dixie Hwy. to Oslo Rd.

 

Bridges

 

Winter Beach – North Canal

Daytime bridge work operations, including crane mobilization and pile driving, Monday to Sunday, 7 a.m. to 7 p.m., continuing through 2022 to construct a railroad bridge on the west side of the existing active railroad bridge.

 

 

St. Lucie County

 

Railroad Crossings

 

 

Port St. Lucie – SE Walton Rd.

  • Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit SE Walton Rd.

 

 

Martin County

 

Railroad Crossings / Lane Closures

 

Jensen Beach – Riverview Dr.

Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit Riverview Dr.

 

Jensen Beach – County Line Rd.

Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit County Line Rd.

 

Jensen Beach – NE Jensen Beach Blvd.

Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NE Jensen Beach Blvd.

 

Jensen Beach – NE Dixie Hwy.

Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NE Dixie Hwy.

 

Stuart – Alice St.

Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NW Alice St.

 

Stuart – NW Fern St.

Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NW Fern St.

 

Stuart – West of SE Dixie Hwy./A1A between SE Decker Ave. and SE Monterey Rd.

Daytime southbound shoulder closures for concrete pouring, Monday to Friday, 7 a.m. to 3 p.m.

 

Stuart – Southbound A1A from south of SE Cove Rd. to south of SE Alicia St.

Continuous shoulder closure through 2022.

 

 

Bridges

 

Port Salerno – Salerno Waterway South

Daytime bridge work operations, including crane mobilization, demolition and pile driving. Monday to Saturday, 7 a.m. to 7 p.m., continuing through Q3 2022.

 

 

Palm Beach County


Railroad Crossings / Lane Closures
.

 

Jupiter – Riverside Dr.

Full road closure beginning 7 a.m. Thursday September 29 until 6 p.m., Sunday, October 9.

Detour Information

  • Eastbound Riverside Dr. traffic will be directed to travel north on Seabrook Rd., travel east on Tequesta Dr. to Old Dixie Hwy. and travel south on Old Dixie Hwy. to access Riverside Dr.
  • Westbound Riverside Dr. traffic will be directed to travel north on Old Dixie Hwy. to Tequesta Dr., travel west on Tequesta Dr. to Seabrook Rd. and travel south on Seabrook Rd. to access Riverside Dr.

 

Jupiter – Riverside Dr. and Alternate A1A

Daytime flagging operations, 7 a.m. to 5 p.m. to move materials for bridge construction, continuing through 2022. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit the right of way.

 

Bridges

Jupiter – Loxahatchee River

Daytime bridge work operations, 7 a.m. to 7 p.m., Monday through Sunday, continuing through 2022 for bridge construction.

 

 

BRIGHTLINE STATION CONSTRUCTION – BOCA RATON and AVENTURA

Palm Beach County

 

Boca Raton – Railroad Crossing at Palmetto Park Rd.

Daily lane closures, 10 a.m. to 2:00 p.m., Friday, September 9.

 

Boca Raton – Railroad Crossing at NW 2nd St.

Full road closure, 8 a.m., Saturday, September 17 to 7 p.m., Friday, September 23.
Eastbound NW 2nd St. will remain open to access NW 1st Ave.

Detour Information:

  • Westbound NW 2nd St. traffic will be directed to travel south on Dixie Hwy. to Palmetto Park Rd., travel west on Palmetto Park Rd. to NW 2nd Ave. and travel north on NW 2nd Ave. to NW 2nd St.
  • Eastbound NW 2nd St. traffic will be directed to travel south on NW 2nd Ave. to Palmetto Park Rd., travel east on Palmetto Park Rd. to Dixie Hwy. and travel north on Dixie Hwy. to NW 2nd St.

 

 

Miami-Dade County

 

Miami – W. Dixie Highway / Harriet Tubman Highway between NE 202nd St. and NE 195th St. (LONG TERM CLOSURE)

Full road closure through October 2022.

Detour Information:

  • Southbound W. Dixie Highway / Harriet Tubman Highway traffic will be directed to travel west on NE 206th St. or NE 202nd St. and turn south on NE 26th Ave. which joins with W. Dixie Highway / Harriet Tubman Highway south of NE 193rd St.
  • Northbound W. Dixie Highway / Harriet Tubman Highway traffic will be directed to continue north on NE 26th Ave. and travel east on NE 202nd St. to access W. Dixie Highway / Harriet Tubman Highway.

For more information, visit www.gobrightline.com and follow us on Facebook, Instagram, and Twitter.

Spread the love!